Sedco Energy. Trato profesional y seguridad.

 

 

 

Main Air Condition Pump. Overhaul and recomission.

B.O.P. Hydraulic Accumulator recomission and recondition of the B.O.P Frame steelwork.

Remove main seawater cooling pump strainers and valves for entire Sedco Energy cooling system. 180 valves in all.

Install new valve in hydrafone tank for sonar device.

Overhaul and replace all low pressure mud lines and valves from mud pits to the high throught to the pressure mud pumps.

Complete overhaul of all 4 pump room ballast systems.

Complete overhaul of anchor fairleads. 8 units in total.

Overhaul Hydraulic System for variable pitch propellers, also repair of two of the main pumps.

Complete Overhaul of Hydraulic and Mechanical deck machinery.

Electric-Hydraulic Powered Gantry Crane with integrated HPU:
· Vertical Pipe handling system
· Iron Roughneck
· Torquemaster

Renew all Hydraulic hoses in the Top drive Manufacture 3 new Skimmer tanks (45 M3) and reconfigure pipe system.

 

 
Las Palmas Port, Puerto de la luz, hidráulica, hydraulics, taller naval, naval workshop, mantenimiento naval, naval maintenance, mantenimiento de buques, vessel maintenance, oil and gas, hidramar UK, petróleo y gas, oil rig maintenance, mantenimiento de plataformas petrolíferas
 
Referencias:
John Barron. Jefe de Proyectos.
Yashin Chahin. Jefe de Proyectos.
 
Horas facturadas: > 34.000 hrs.
Fecha: 03/2011 - 08/2011