Sedco Express. Trabajo duro y eficiencia.

 

 

 

Remove the main Seawater Cooling Pump Strainers and Valves for the entire Sedco Express cooling system.

Install a new valve in Hydrophone Tank for Sonar device.

Overhaul and replace Low Pressure Mud Lines and Valves from the mud pits to the High Pressure Mud Pumps.

Renewal of the firefighting system pipelines as per program.

Major pipeline works in the Settling Tank Compartment of the mud pit system and refurbishment of the main mud valves.

Main Air Condition system overhaul and re commission.

Renew main Sea Chest pipes in the 4 ballast pump rooms.

Recommission B.O.P. Hydraulic Accumulators and recondition the steelwork on frame.

Renewal of a multitude of Air Conditioning Ducts.

Complete overhaul of the valves on the main ballast system.

Complete overhaul of Anchor Fairleads. 8 units in total.

Complete Overhaul of Hydraulic and Mechanical deck machinery

Renew the Hydraulic hoses on a multitude of different equipment on the Drill floor and in the Derrick.

 

 
Las Palmas Port, Puerto de la luz, hidráulica, hydraulics, taller naval, naval workshop, mantenimiento naval, naval maintenance, mantenimiento de buques, vessel maintenance, oil and gas, hidramar UK, petróleo y gas, oil rig maintenance, mantenimiento de plataformas petrolíferas
 
Referencias:
Vernon Smith. Jefe de Proyectos.
 
Horas Facturadas: > 28.000 hrs.
Fecha: 07/2010 - 09/2010