GSF Jack Ryan. Dando un extra de calidad y esfuerzo.

 

 

 

Complete flushing, Overhaul and re-commission of Drill String Weight Compensator in Derrick.

Assist Sparrows in removing complete Seatrax crane from pedestal and installation of new crane.

Hidramar also completely overhauled the Hydraulics’ on the 3 further cranes onboard.

Complete mechanical overhaul and refurbish of B.O.P Transporter in the Moon pool area.

Maintenance on seals motors and pins on Canister thruster rooms Nº 1 and Nº 2.

Remove and refurbish High Pressure Valves and drainage valves in the Heave compensator and High Pressure air system (72 bottles), and inspect all with endoscopic camera.

Overhauled mud valve and pipe works at Mezzanine deck.

Installation of a new Pneumatic system for control of the Mud Valve Actuators at mezzanine Deck

Fabricate and Install two platforms for Centrifuges.

Remove and renew all hydraulic hoses on the Lower Marine Riser Package of the B.O.P. and re-commission.

Supply Mechanics for repairs in the Engine room.

 

 
Las Palmas Port, Puerto de la luz, hidráulica, hydraulics, taller naval, naval workshop, mantenimiento naval, naval maintenance, mantenimiento de buques, vessel maintenance, oil and gas, hidramar UK, petróleo y gas, oil rig maintenance, mantenimiento de plataformas petrolíferas
 
Referencias:
Walter Hunter. Jefe de Proyectos.
 
Horas facturadas: > 22.000 hrs.
Fecha: 11/2010 - 12/2010