Complete and entire Refurbishment, Installation, commissioning of the Ballast system.
The Installation, Commissioning of all Hydraulic Control Panels for the entire Ballast system.
Installation of the A frame Winch System for Oceaneering.
Renew around 300 Meters of ventilation pipe for Ballast tanks.
Overhaul and commissioning of Flap Valves in Ventilation Ducts for firefighting system, all succeded DNV class approval first time round.
Machining and Overhaul of Hydraulic´s on Torquemaster and Pipe Handling Machine.
Install 4 new HP Air Compressors and all pipe installation work.
Overhaul of Balloon actuators in the pump room.
Install new pipes in Mud system.
Install all plumbing in galley.
Flushing of Hydraulic pipes for Top drive and Derrick systems. |