Stena Tay. Gran trabajo tecnico.

 

 

 

Complete and entire Refurbishment, Installation, commissioning of the Ballast system.

The Installation, Commissioning of all Hydraulic Control Panels for the entire Ballast system.

Installation of the A frame Winch System for Oceaneering.

Renew around 300 Meters of ventilation pipe for Ballast tanks.

Overhaul and commissioning of Flap Valves in Ventilation Ducts for firefighting system, all succeded DNV class approval first time round.

Machining and Overhaul of Hydraulic´s on Torquemaster and Pipe Handling Machine.

Install 4 new HP Air Compressors and all pipe installation work.

Overhaul of Balloon actuators in the pump room.

Install new pipes in Mud system.

Install all plumbing in galley.

Flushing of Hydraulic pipes for Top drive and Derrick systems.

 
Las Palmas Port, Puerto de la luz, hidráulica, hydraulics, taller naval, naval workshop, mantenimiento naval, naval maintenance, mantenimiento de buques, vessel maintenance, oil and gas, hidramar UK, petróleo y gas, oil rig maintenance, mantenimiento de plataformas petrolíferas
 
Referencias:
Keith Brown. Jefe de Proyectos.
 
Horas Facturadas: > 14.000 hrs.
Fecha: 08/2009 - 12/2009