Mooring; removal, overhaul and reinstatement of fairleads.
Propulsion; Thruster HPU overhaul, replacement of thruster HPU lines, flushing thruster hydraulic system prior to startup.
Subsea
BOP handling; Install new stainless pipework to the pneumatic chain hoists and commission and load test.
Drilling
Pipe handling; Supply technical assistance to NOV during the fingerboard and control tower overhaul.
Pipe handling; Supply technical assistance to NOV during the overhaul of the pipe racking system.
HP mud system; Supply technical assistance to TSC during the installation and commissioning of ABCO crash kits to the four national 14 –P-220 mud pumps.
LP mud; Remove, refurbish, recertify the overboard dump valves.
Pipe handling; supply technical assistance to AKER during the installation and commissioning of two new MH1899 iron roughnecks.