Oil & Gas

Eirik Raude

The Norwegian challenge
Marine systems
  • Helifuel system; modification of the helicopter fuelling system pipework to allow installation of new flow meter.
  • Bunkering system; manufacture and install 130meters of stainless piping and valves in fresh water system.
  • Renew HP Air line for compressor APV.
  • Structural; install supports for temporary stairway between quay side barge and platform.
  • Structural; general fabrication work and structural repairs.
  • Waste treatment; Manufacture and install new sewage treatment plant and replace
    black waterlines.
Marine
  • Accommodation; Install new fresh water lines throughout the accommodation.
  • Cathodic protection; install new anodes in ballast tanks.
  • Cathodic protection; Supply vendor with technical assistance to install Impressed cathodic current protection system implementation (ICCP).
  • Fast rescue craft; Install new hydraulic lines to the FRC davit HPU.
  • Propulsion; logistical support for the equipment and for thruster change out.
Drilling
  • Flare boom; Renew and replacement of around 210 meters of gas test well pipe.
  • LP mud system; Overhaul and certify overboard dump valves.
  • HP mud system; Carry out 30K pressure test after C&K manifold modifications for vendor.
  • Riser tensioning system; Overhaul of four main riser tensioners (MRT ́s).
  • Hydraulic system; carry out flushing to NAS6 of HPU ring main.

References

Pål Eikrem · Subsea Project Engineer

Invoiced hours: > 29.000 hrs
Date: 10/2012 – 12/2012