  • HP mud; remove, inspect and refurbish and recertify the Choke and Kill line flex loops according to oil states procedures.
  • HP mud; Carry out dimensional and NDT inspection of 7 gooseneck connections according to oil states inspection procedures and coat 3 coat epoxy system to oil states standard. Drill pipe inspection; Carry out cleaning and inspection and recertification of to 27 joints of 5 1⁄2” drill pipe tin accordance with DS1- Cat5 inspection procedures.
  • Riser Conduit; Carry out dimensional and NDT inspection of adapter block inspection.

References

Mihai Dimancescu · Project Manager

Invoiced hours: > 34.000 hrs
Date: 04/2014 – 07/2014