Oil & Gas

Sedco Express

Efficiency and hard work

Marine systems
  • Seawater cooling system; Refurbish the seawater cooling pumps and valves.
  • Positioning; Install new hydrophone skin valve.
  • HVAC system; Main Air Condition system overhaul and commissioning.
  • HVAC system; Manufacture and replacement of various air conditioning ducting.
  • Fire main system; Manufacture and replacement of the pipe spools.
  • Ballast system; Manufacture and installation of the main Sea Chest pipe spools.
  • Ballast System; Overhaul of the ballast system valves.
  • Mooring system; remove, refurbish, and reinstate fairleads.
Drilling equipment
  • Mud return system; Major pipe spool replacement and valve refurbishment works in the mud return mud valves.
  • LP mud system; Replace piping and refurbish valves.
  • Hydraulic system; Survey, manufacture, certify and install derrick and drill floor hydraulic hoses.
  • Drill pipe handling equipment; provide technical mechanical and hydraulic support for the overhaul of the two MOS drill pipe crane and catwalk structure and travelling equipment, refurbish drag chains, replace hydraulic tubing, flush system, and commission.
Subsea
  • BOP Hydraulic Accumulator package; Accumulator inspection and recertification, replace stainless tubing, and refurbish frame steelwork.
  • Riser Gantry crane; provide technical mechanical and hydraulic support for the overhaul of the RGC lifting and travelling equipment, replace hydraulic tubing, flush system, commission and load test.

sedco express

References

Vernon Smith · Project Manager

Invoiced hours: > 28.000 hrs
Date: 07/2010 – 09/2010